DIGITAL EXAMINATION / CPNS SELECTION INFRASTRUCTURE

Scalable facilities for secure computer-based examination operations

PT Wira Eka Bhakti provides configurable facilities and technical infrastructure for CPNS selection and other large-scale computer-based examinations. Capacity can be arranged from 100 to 500 participants per session according to venue, schedule and organizer requirements.

COMPUTER-BASED EXAMINATION

One integrated examination environment

The service combines candidate workstations, server and control-room systems, wired network infrastructure, connectivity, electrical resilience, CCTV, printing and administrative devices, room support systems, technical staffing and operational readiness procedures.

INFRASTRUCTURE PACKAGE

Infrastructure supplied and coordinated

01

Candidate Workstations

Desktop PCs or laptops, displays, keyboard/mouse, standardized OS and examination configuration, endpoint hardening, numbered seating and ready spare units for rapid replacement.

02

Server & Control Room

Server infrastructure as required by the examination architecture, rack and power support, administrator workstations, monitoring screens, local operational logs and technical control area.

03

LAN, Internet & Security

Structured cabling, managed switches, VLAN segmentation, routers, firewall, bandwidth monitoring, primary and backup connectivity, controlled access and documented network topology.

04

Power Reliability

Dedicated electrical distribution, UPS for critical devices, PDU, surge protection, grounding, cable management and optional generator-backed continuity depending on venue conditions.

05

Printing & Administration

Network printers, document/scanner support where required, registration/admin PCs, check-in desk equipment, consumables and operational documentation facilities.

06

CCTV & Supervision

IP CCTV coverage for examination rooms, entry/exit and control areas, NVR/recording infrastructure, monitoring displays and retention settings according to project requirements.

07

Room & Participant Facilities

Exam tables and chairs, lighting, air-conditioning/ventilation, signage, queue and waiting area arrangement, equipment zoning, accessible circulation and orderly cable routing.

08

Technical Operations

Deployment engineers, network/server support, floor technical team, helpdesk, spare-device pool, issue escalation, incident logging and session-by-session readiness checks.

PROJECT DELIVERY

Delivery workflow from site survey to live operation

  1. Site survey, venue assessment and capacity planning
  2. Room layout, electrical load, network and CCTV design
  3. Equipment staging, imaging/configuration and asset labeling
  4. Installation, structured cabling and end-to-end technical testing
  5. Simulation / rehearsal and readiness verification before examination day
  6. On-site live session support, monitoring, spare replacement and incident response
  7. Daily/session reporting, demobilization and handover documentation
SECURITY & RELIABILITY

Control, resilience and technical readiness

Controlled candidate/device allocation and asset numbering
Restricted endpoint settings and USB/access control as required
Network segmentation and controlled administrator access
CCTV monitoring and operational evidence recording
Pre-session checklist, device health check and spare-unit readiness
Incident escalation path and technical event log for each session
SCALABLE CAPACITY

Flexible capacity packages

The venue layout and session schedule can be configured for 100, 200, 300, 400 or 500 participants per session, subject to the approved site, equipment plan and applicable organizer/BKN technical requirements.

TECHNICAL NOTE

The final device specifications, network/security settings, room layout, redundancy and acceptance criteria must follow the official technical requirements applicable to the specific selection activity.

EXAMINATION OPERATIONS

Need a ready-to-operate computer-based examination venue?

WEB can prepare the venue, devices, network, control room, monitoring systems and on-site technical operations as an integrated package.

Discuss Examination Infrastructure